FEASIBILITY ANALYSIS ARSENIC IMPACTED SEDIMENTS
BRIGGS POND, VILLAGE OF PAW PAW


Phillips Environmental Consulting Services, Inc. was retained by the Village of Paw Paw to prepare a Feasibility Analysis to evaluate potential treatment and disposal options for sediments which have collected within Briggs Pond (formerly known as Ismond Pond) located in the Village of Paw Paw. Similar sediments have washed through to Maple Lake and have collected particularly in the south basin area of the lake. Finding of this study likely would apply to Maple Lake Sediments as well. The report and all of its data has been broken into manageable Adobe pdf file sizes which should be easily viewed by all. To view the complete report and all its appendices.

Sediment Feasibility Study Final Report
Location Map
Appendix A Part 1
Appendix A Part 2
Appendix A Part 3
Appendix A Part 4
Appendix A Part 5
Appendix A Part 6A
Appendix A Part 6B
Appendix A Part 6C #1
Appendix A Part 6C #2
Appendix A Part 6D
Appendix A Part 7
Appendix A Part 8
Appendix A Part 9
Appendix A Part 10
Appendix B
Appendix C

.

.. ..  

 



 

Ma

 

© 2007
Site Maintained by: Butler Computer Services